Tuesday, May 29, 2018

Water Main Installation Completed. Water Service Replacements to be completed by end of the week.

Work Performed Previously
·         Testing of new water main completed
·         Replaced sanitary sewer services that were planned to be replaced
·         Started water service replacement to each of the homes.

Work Anticipated to be performed next week, May 29th to June 1st  
·         Complete water service replacements
·         Make connection to existing water main at Silverwillow Drive
·         Continue with sanitary sewer main repairs

As you are aware, the weather over the past few weeks has not been favorable with the frequent rain events. Construction has been delayed, but everything is being done to keep the project on schedule to the greatest extent possible.

The disruptions to your water service are coming to an end.  The water service replacements are anticipated to be completed by the end of the week. There are a total of 3 water main connections to the existing water main system at the project limits and each intersection.  It is anticipated those will be completed in the next 1-2 weeks. 24-hour notice will be provided to those affected residents prior to the schedule water main shut-down to make the connections.

Thanks again for all your patience and understanding.

Friday, May 11, 2018

Underground Utility Improvements On-Going.

Work Performed This Week, May 7th to May 11th
·         Completed water main installation along the project site
·         Started performing necessary testing to new water main system prior to placing into service
·         Sanitary sewer service replacements as planned

Work Anticipated to be performed next week, May 14th to May 18th
·         Complete testing necessary for new water main
·         Continue with sanitary sewer service replacements
·         Begin storm sewer installation

The recent rain events have helped in controlling the amount of dust present; however, be assured we will try to minimize the amount of dust to the greatest extent possible by utilizing water, street sweepers, and chemicals as needed.  Some travel delays through the project site are to be expected, your patience in traveling to and from your home is greatly appreciated. We are committed to ensure proper travel ways are maintained to provide access. We do anticipate some potholing will occur within the trenches and gravel sections of roadway, these will be smooth out on a regular basis, but please drive carefully.

Thank you again for all your understanding as you live within the construction area.