Friday, July 27, 2018

Culvert Replaced. Concrete Headwalls to be Constructed

Work Performed:
·         Removed existing culvert at South Navy Ditch
·         Replaced existing sanitary sewer under culvert
·         Installed new precast concrete culvert at South Navy Ditch

Work Anticipated to be performed, July 30th to August 3rd  
·         Frame and pour concrete headwalls
·         Install storm sewer that connects to new precast concrete headwalls
·         Backfill around precast culvert
·         Depending on work progress, the roadway could be re-opened by the end of the week.

The existing culvert was removed and replaced this past week. Work will continue on the culvert next week with the concrete headwalls being framed and poured along with backfilling around the culvert. 

Thanks again for all your patience as you have been using alternate routes due to the roadway closure while the culvert is being replaced.